
Organic Process Research and Development p. 1644 - 1652 (2017)
Update date:2022-08-10
Topics:
Yu, Zhiqun
Ye, Xin
Xu, Qilin
Xie, Xiaoxuan
Dong, Hei
Su, Weike
A fully continuous-flow diazotization-hydrolysis protocol has been developed for the preparation of p-cresol. This process started from the diazotization of p-toluidine to form diazonium intermediate. The reaction was then quenched by urea and subsequently followed by a hydrolysis to give the final product p-cresol. Three types of byproducts were initially found in this reaction sequence. After an optimization of reaction conditions (based on impurity analysis), side reactions were eminently inhibited, and a total yield up to 91% were ultimately obtained with a productivity of 388 g/h. The continuous-flow methodology was used to avoid accumulation of the highly energetic and potentially explosive diazonium salt to realize the safe preparation for p-cresol.
View More
ChangZhou XiaQing Chemical Co., Ltd.
Contact:+86-519-88721665
Address:3# Hengluo Road, Henglin Town, Changzhou City, Jiangsu Province,China
Changzhou Ansciep Chemical Co.,Ltd.
Contact:+86 519 8630 5871
Address:A-710 Boan International, 8 East Guangdian Road,Wujin,Changzhou
Guangzhou Swan Chemical Co., Ltd.
Contact:+86-20-31075659
Address:NO.301, Hong ba fang investment BLDG 1,Guan chong village,Shiqi town,Panyu district,Guangzhou
Wuhan Sunrise Pharmaceutical Technology Co., Ltd
Contact:+86-27-83314682
Address:Room 340, New material Industrial base No.17, Gu Tian Five Lu , Qiaokou District, Wuhan , China
Zhuhai Rundu Pharmaceutical co.,Ltd
Contact:+86-756-7630755
Address:No.6,North Airport Road,Sanzao Town,Jinwan District
Doi:10.1246/bcsj.47.257
(1974)Doi:10.1016/j.jorganchem.2013.10.017
(2014)Doi:10.1021/jo01265a045
(1968)Doi:10.1080/17415993.2020.1795175
(2020)Doi:10.1039/DT9720001470
()Doi:10.1021/jp036859v
(2003)